LEAN IMPLEMENTATION AND SUPPLY CHAIN DEVELOPMENT AT OAK HILLS

1. The Oak Hills facility’s facility quality problems are so numerous that it will take much effort and other resources to convert to a lean system. Based on the seven principles of a lean system, the facility lacks the needed information and knowledge on current E & E projects; confronts a weak elimination system of wastes, especially hazardous wastes; incurs high inventory holding costs; disjointed and supply chain; poorly performing machines; and a poorly performing workforce. It responds to fast delivery but not to a beneficial deferment of orders (Visich & Wicks, 2013).

2.The manufacturing department needs to restructure the current costs of the three components of the box of the testing instrument. It should find another supplier or negotiate a shorter delivery of the cases, Fix the high temperature requirement of sensor boards and conduct a regular inventory of the lids, Labor costs and manufacturing systems should be rationalized to account for a greater share of tthe overall packaging and production costs. And the material requirements planning system currently used for ordering raw materials should be utilized in scheduling production (Visick & Wicks, 1273). The first two are short-terms while the last two are long-term.

3. They are accustomed to turn out rush orders but need to learn to do so just in time to give themselves time to base decisions on market reality. This is one of the principles of a lean system. Some employees were laid off as a result of cost-cutting decisions and this has lowered the morale of those who have been retained. Company mergers, the lack of communication with management and the unavoidable exposure to health hazards like lead and environment changes  are other unsettling factors. Smooth transition to a lean system requires a reorganization or restructuring of the workforce and a re-definition of tasks and duties. They should be promptly and duly informed of company developments and subjected to immediate and regular health check-ups especially for lead poisoning.

4. Its supply chain is at a chaotic stage of waste. The working areas for the three components should be adjacent to one another or as close as possible. Raw materials should ideally come from the same supplier located at a shorterer distance. An efficient cleaning system should be installed to allow the seven machines to function while wastes are eliminated. Employees should be taught to work efficiently. Worn-out machines should be replaced for efficiency as this cheaper alternative to repair. The metal bar used to level powdered metal should be inspected regularly to avoid damage from continuous scrapping and replaced. Lids must be checked and not only recorded by the maker to assure that they can withstand the pressure of transporting. They and the bins should be tightly closed and sealed after work to prevent contamination. All casus of failure from tests should be prepared for as far as possible to eliminate the need to determine them. Workers’ tasks should be tightly scheduled and monitored.  Defective lids should be retained and repaired well. The seven press machines should be operated at coordinated times so as not to create backlog. And makers should monitor the cartons of boxes before dispatch to avoid reaching customers in a damaged stage.

5. Demand management covers all processes from controlling and tracking requirements, purchasing operations, forecasting, planning and managing demand and related services. Supply chain, in turn, covers all the steps from follow and bring the product to the customer.

6. The strategy should streamline all production operations, resources and procedures in the long term and systematize work and schedules in the short term to reduce and progressively eliminate backlog while improving employee morale and customer satisfaction. These will be difficult to management and the employees at the start but the rewards will motivate them if explained well.

WORK CITED

Visich, J.K., & Wicks, A.M. (2013). Lean implementation and supply chain development at   

Oak Hills. Bryant University. P. 79-86. Retrieved from https://nu.blackboard.com/bbcswebdav/pid-1264980-dt-content-rid4687838_1/courses/MGT608-655111512/Lean%20Implementation%20and%20SCM%20at%20OH%20wisner_case_pt03_13.pdf

2019/5539

Author: admin